Energy consumption by servers and data centers is one of the fastest growing sectors in the U.S. With the push towards cloud computing and limited available space, today’s MEP engineers are challenged with developing new, and retrofitting legacy, data centers that are both cost effective and energy efficient. Finding the right combination of floor and ceiling tile layouts, CRAC size and location, drop ceilings and containment strategies can be overwhelming when combined with the pressures of very tight project schedules, which can lead to overdesigning and exceeding budget.

Our team of simulation specialists has years of experience partnering with MEP and architectural firms to quickly uncover the flow and thermal insight required to push the boundaries of today’s cooling strategies and produce energy efficient data centers needed to support rapidly growing IT demands.

Application Areas

  • Hot/cold aisle arrangements
  • Free cooling
  • Enclosure-based containment
  • Water-cooled systems
  • Energy audits
  • Transient thermal responses
  • Catastrophic failure modes

Benefits of Rand Simulation Insight

  • Assessing cooling effectiveness before construction
  • Validating energy conservation measures (ECMs) on retrofits
  • Substantiating performance claims to facility owners
  • Identifying exhaust recirculation and areas of cool air bypassing server racks
  • Optimizing tile locations, CRAC locations and raised floor dimensions
  • No flow/thermal expertise or software needed – We have it!

Get a free project scoping assessment

See how data center simulation can benefit your team.

CLIENT TESTIMONIAL

“Energy consumption by servers and data centers is one of the fastest growing sectors and currently represents ~5% of the total consumed electrical power in the U.S. With the push towards cloud computing and limited available space, today’s MEP engineers are challenged with developing new, and retrofitting legacy, data centers that are both cost effective and energy efficient. Finding the right combination of floor and ceiling tile layouts, CRAC size and location, drop ceilings and containment strategies can be overwhelming when combined with the pressures of very tight project schedules, which can lead to overdesigning and exceeding budget. “Securing a data center tenant can be a challenge for facility owners without upfront confirmation of sustainable operation given the energy costs required for cooling and post-installation retrofit costs. We have leveraged the IDP, now Rand SIM, team on several occasions now to provide visual evidence of a viable HVAC strategy to prospective tenants. Not only have they been able to quickly depict data center thermal stratification, but also influence tile layout modifications to eliminate hot aisle recirculation for greater rack efficiency.”

Sr. Design/Build Project Manager, Lee Technologies Services, Inc

Chris Kincaid